Illinois Mineral Co / Midwest Jcn
Date: 04/20/2008
Illinois Mineral Co / Midwest Jcn
Date: 04/20/2008
IllIllinois Mineral Co / Midwest Jcn
Date: 04/20/2008
Illinois Mineral Co / Midwest Jcn
Date: 04/20/2008
Indiana Aggregate & Construction Supplies
Date: 04/20/2008
Indiana Aggregate & Construction Supplies
Date: 04/20/2008
Indiana Aggregate & Construction Supplies
Date: 04/20/2008
Indiana Aggregate & Construction Supplies
Date: 04/20/2008
Indiana Aggregate & Construction Supplies
Date: 04/20/2008
Indiana Aggregate & Construction Supplies
Date: 04/20/2008
Indiana Aggregate & Construction Supplies
Date: 04/20/2008
Indiana Aggregate & Construction Supplies
Date: 04/20/2008
Illinois Mineral Co stone bunker
Date: 04/20/2008
Midwest Jcn / South Forest Area
Date: 04/20/2008
Midwest Jcn
Date: 04/20/2008
Midwest Jcn
Date: 04/20/2008
South Forest
Date: 04/20/2008
South Forest
Date: 04/20/2008
South Forest
Date: 04/20/2008
South Forest
Date: 04/20/2008
South Forest
Date: 04/20/2008
South Forest
Date: 04/20/2008
Thorn Creek
Date: 04/20/2008
Thorn Creek
Date: 04/20/2008
Thorn Creek
Date: 04/20/2008
Thorn Creek
Date: 04/20/2008
Thorn Creek
Date: 04/20/2008
Interchange Yard
Date: 04/20/2008
Interchange Yard
Date: 04/20/2008
Interchange Yard
Date: 04/20/2008
Interchange Area Extension
Date: 04/29/2008
Originaly this area was going to have an industry - a Silos - but I decided to make it more scenic, and to have the RIP facility as the only 'industry' on this module.
Interchange Area Extension
Date: 04/29/2008
South Forest
Date: 04/29/2008
This is where the Plymill was located some time after this photo was taken.
American Electric
Date: 04/29/2008
Illinois Staging
Date: 04/29/2008
South Forest Flour Mill - Cleared Area
Date: 05/04/2008
South Forest Flour Mill - Cleared Area
Date: 05/04/2008
South Forest Flour Mill - Masonite Form
Date: 05/04/2008
South Forest Flour Mill - Front Wall
Date: 05/04/2008
The front and rear walls and roof were made from balsa wood. Here the front wall is shown with windows and door in place but before it is attached to the rest of the building.
South Forest Flour Mill - Painted
Date: 05/04/2008
This photo is the building with the front wall attached to the rest of the building, but before the balsa roof was added.
South Forest Flour Mill - painted
Date: 05/04/2008
South Forest Flour Mill - Roof added
Date: 05/10/2008
South Forest Flour Mill
Date: 05/10/2008
From above the South Forest trackage.
Control Panel Re-Install and Remote Turnout Re-wiring
Date: 08/22/2010
Control Panel
Control Panel Re-Install and Remote Turnout Re-wiring
Date: 08/22/2010
Control Panel with DCC Controller hooked onto the side of the panel.
Control Panel Re-Install and Remote Turnout Re-wiring
Date: 08/22/2010
View of some of the wiring needed.
Control Panel Re-Install and Remote Turnout Re-wiring
Date: 08/22/2010
Electrical Connectors used so that the control panel can be quickly disconnected.
Prior to the big move back in July 2008 the wiring was not designed to be easily disconnected and as a result the various wires had to be cut with wire cutters. That should not need to happen again!
Control Panel Re-Install and Remote Turnout Re-wiring
Date: 08/22/2010
Inside the control panel. The Power Supply provides 19V @ about 3A - enough power to change a turnout.
Control Panel with old writing painted over
Date: 09/15/2010
Secondary Control Panel
Date: 09/15/2010
Shadow Boxes being added 1
Date: 12/12/2010
Shadow Boxes being added 2
Date: 12/12/2010
Shadow box aded to Dolton Junctiopn module
Date: 12/12/2010
Shadow box and non-shadow box comparision
Date: 12/12/2010
'New' Van Loon baseboard in location
Date: 03/07/2011
'New' Van Loon baseboard in location
Date: 03/07/2011
'New' Van Loon baseboard in context
Date: 03/07/2011
'New' Van Loon baseboard with Artist Impression
Date: 03/07/2011